2  Unit installation
66
SMGB0077 rev.0 - 01/2013
2.9  KPI energy / heat recovery unit and KPI active unit
2.9.1  Accessories supplied with the unit
Check that the following accessories are supplied with the unit.
N O T E
Please contact your HITACHI distributor if any of the accessories has not been supplied with the unit.
 
Accesory Appearance Quantity
Duct adapter
4
Screw
24
Washer
8
Nut
12
Vibration Abs.Rubber
4
Rubber duct joint
4
2.9.2  Unit installation
Initial checks
KPI-(252-2002)E3E / KPI-(502-2002)H3E 
energy / heat recovery unit
KPI-(502-1002)X3E active unit
(mm)
Check  that  there  is  enough  space  around  the  unit.  Consult  the  corresponding  chapter  of  the Technical  Catalogue  for 
information on the unit measurements.
Before starting installation, plan the direction of the pipes and wiring required. Also bear in mind that there must be enough 
space around the unit for installation and maintenance.
Check that the ceiling surface where the unit is to be installed is completely horizontal.