EasyManua.ls Logo

Hitachi SJ700 Series - Installing the Option Board

Hitachi SJ700 Series
46 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 2
Page 10 of 46
Installing the Option Board
Power down the inverter and wait at least five minutes before moving to the next step. Open and remove the
lower terminal cover. Confirm that the red CHARGE LED is extinguished and that the DC bus is fully
discharged before proceeding further, otherwise there is the danger of electric shock. Then remove keypad from
the inverter. You can now remove the upper front cover to expose the two option ports inside.
Figure 2-3 below shows how to install the option board to option port 1 or 2 of the inverter. There are four holes
on the corners of the option board. Align the board with the port connector in the proper orientation (to the left,
when facing the inverter as show). Then align the top two holes with the two screw holes, and the bottom two
holes with the two guide posts. Insert the board fully into the connector. Secure the board with the two M3
screws supplied.
Figure 2-3
Installation of SJ-EN
Option port 1
Option port 2
Guide posts for
option board positioning
Screw holes for securing the option board
(M3 screws x 2)
Option board

Other manuals for Hitachi SJ700 Series

Related product manuals