26
Mast Preparation
7. Check that the bolts of the
shroud anchor bars are well
tightened. Attach the shroud
stay adjuster to the anchor
bolts on each hull with the
clevis pins and lock rings
supplied.
9. lay the mast on top of the
frame with the mast head aft.
Position the mast foot in front
of the step link body in order
to insert the pin through.
10. Attach the shrouds to the top
holes of the adjusters. Make
sure that the shrouds are not
crossed at the mast tang. Put
the shroud covers over the
adjusters. The mast is ready
for stepping.
8. Place the mast pivot bearing
in the mast step cup. Install
the mast step link following
the instructions supplied with
the kit.