/
JOB
Every Every Every
1
Daily
1
5
Hours
/
15
Hours
/
50
Hours
Check, Operation
Operation Operation
1.
EXAMINE AND CLEAN EXTERIOR OF SAW
2.
SHARPEN CHAIN
3.
REVERSE GUIDE BAR TOP FOR BOTTOM ON SAW
4.
CHECK SCREWS, TIGHTEN LOOSE FASTENERS
5.
CLEAN GUIDE BAR, MOUNTING PAD AREA,
AND OIL DISCHARGE HOLE
6.
CHECK AIR FILTER
7.
LOWER CHAIN DEPTH GAUGES
8.
CHECK FUEL FILTER
9.
CLEAN SPARK PLUG AND GAP TO
.025"
10.
DISASSEMBLE MUFFLER, AND CLEAN MUFFLER
AND CYLINDER EXHAUST PORT.
11.
CLEAN CYLINDER FINS, AIR INTAKE AND
ENGINE COOLING PASSAGEWAYS.
NOTE
F~gure that each hour of operat~ng time requlres
4
tankfuls of fuel
PERFORMANCE LOG
Keep
track
of
the
use
made
of
your
saw
by
recording the
number
of
times
saw
is
refueled.
5 10 15 20 25 30
60
90
120
150
180
21 0
240
270
300
11111111111111111111111111111J330
I
FILL IN THIS INFORMATION FOR YOUR RECORD
MODEL NO.
UT
NO.
SERIAL NO.
DATE OF PURCHASE
NAME OF DEALER
ADDRESS
INVOICE NO.
SAFE*T.TIW
(Pat
Pendlng)
-
-kn-
3
c
-2
=