EasyManua.ls Logo

Honeywell Dolphin 7800 - Page 157

Honeywell Dolphin 7800
178 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
15 - 7
To secure the base using the optional DIN Rail:
Hardware Required
DIN Rail, Qty. 1
3/16 in. dia x 5/8 in. long pan head screw, Qty. 2
1/2 in. OD x 7/32 in. ID x 3/64 in. thick washer, Qty. 2
3/16 in. dia nut, Qty. 2
1. Position the DIN Rail on the wall bracket, as shown below.
2. Slide the screw through the slot on the DIN Rail and the mounting hole in the bracket.
3. Slide the washer onto the screw and tighten the nut to secure the assembly.
4. Remove the rubber feet on the bottom of the ChargeBase.
5. Slide the base onto the DIN Rail using the slot on the bottom of the base.
Wall Bracket, Qty. 1
DIN Rail, Qty. 1
Washer, Qty. 1
Nut, Qty. 1
Screw, Qty. 2
Washer, Qty. 1
Nut, Qty. 1
Wall Bracket
Charge Base
DIN Rail

Table of Contents

Other manuals for Honeywell Dolphin 7800

Related product manuals