Document No. : Ludao disassembly SOP station :
Operation Name : Ver. : Edit date
Step:
Standard Operation Procedure
Notice: Please inform production line leader or master if you found any abnormal..
Fixture list (Spec.) Qty
Symbol
Safe
Order
Hear
Look
manu
al
Static
Qual
ity
Fix
tur
e
Issue Department:
Lister:
Zhou. Gui-lin
Industrial Engineering Class
Disassemble VGA/B
1.Take MXM screws,take MXM card (pic1)
the torque force of the driver is 1.5+/-
0.2kgf.cm
when taking the screw, align the driver
head first and then turn the electric driver
6(1/2)
pic1
For 125W
1
2
Half finger insert 1
#1 electric screw driver 1
2020/7/1
0.20