Document No. : Ludao disassembly SOP station :
Operation Name : Ver. : Edit date
Step:
Standard Operation Procedure
Notice: Please inform production line leader or master if you found any abnormal..
Fixture list (Spec.) Qty
Symbol
Safe
Order
Hear
Look
manu
al
Static
Qual
ity
Fix
tur
e
Issue Department:
Lister:
Zhou. Gui-lin
Industrial Engineering Class
1. Take M/B.(pic1)
After M/B is picked up from the potion column,
the boss village moves up and to the right
with the metal in hand
Disassemble M/B
18(1/2)
pic1
定位柱
Half finger insert 1
2020/7/1
0.20