EasyManua.ls Logo

Huawei AR530 Series - Page 67

Huawei AR530 Series
219 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Context
NOTICE
There must be a clearance larger than or equal to the router's width at the left and right of the
router after the installation. The clearance above the router must be at least two times the
router's height and the clearance below the router must be greater than or equal to the router's
height.
Make sure the following prerequisites are met before the installation:
l The cabinet is well fixed.
l The router installation position in the cabinet is determined and arranged properly.
l The router to be installed is available and located near the cabinet for convenient
movement.
Tools and Accessories
l Phillips screwdriver
l Mounting kit (one)
l Stainless steel sheet (one)
l M4x30 screws (two)
l M4 screw (six, separately purchased)
Procedure
Step 1 Loosen the screws on the front top cover with a Phillips screwdriver, remove the front top
cover, and keep it in an appropriate place for later use.
L1
L2 L3
FE5
FE4
FE3
FE2
N
A
RS485-0
B
A
RS485-1
DI-0
DI-1
B
GE0
RX
TX
GE1
MONITOR
Power Outage Survival
RX
TX
FE6
FE7
CONSOLE
1
2
Huawei AR500&AR530&AR550 series Industrial Switch
Routers
Hardware Installation and Maintenance Guide
4 Installing an AR530 Series Industrial Switching Router
Issue 05 (2015-12-01) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
59

Table of Contents

Other manuals for Huawei AR530 Series

Related product manuals