10
Installing Lithium Batteries and Cables (ESU-A2400Wh/D)
10.2
4. Install battery cables.
1. Turn off the energy storage management unit (ESMU)
power switch and install the ESMU and ESU-A.
2. Set the ESMU address using the DIP switch and CAN DIP switch.
5. Install a hydrogen discharge tube.
Routing the
hydrogen
discharge
tube out of
the cabinet
COM2
COM_IN
COM_OUT
COM_IN
COM_ELU
COM_ELU IN
3. Install the ESMU signal cables.
4. Install signal cables between the ESU-As and ESMUs.
5. Install ESMU power cables.
6. Install the negative ESU-A power cables.