Do you have a question about the Huawei RRU5909 and is the answer not in the manual?
Brand | Huawei |
---|---|
Model | RRU5909 |
Category | Conference System |
Language | English |
Lists required documents for RRU installation.
Details the tools and instruments needed for RRU installation.
Outlines necessary skills and qualifications for installation personnel.
Describes the external appearance and dimensions of the RRU.
Details the various ports found on the RRU panels.
Explains the function of different indicators on the RRU.
Covers different mounting locations and conditions for RRU installation.
Specifies necessary space around the RRU for proper installation.
Details procedures for lifting RRUs and their mounting kits onto a tower.
Describes how to hoist optical fibers to a tower safely.
Outlines procedures for hoisting power cables onto a tower.
Explains the bracket assembly and attachment plate for an RRU.
Provides steps for mounting RRUs on a pole.
Details the process of installing an RRU on U-steel structures.
Covers the procedure for installing an RRU on angle steel.
Describes how to mount RRUs securely onto a wall.
Explains the installation of RRUs on an IFS06 structure.
Outlines general and specific requirements for routing and securing cables.
Shows how RRU cables are connected in various configurations.
Describes the general procedure for installing RRU cables.
Details the installation of the RRU protective ground (PGND) cable.
Explains how to connect the RF jumper cable to the RRU and antenna.
Covers the installation of AISG communication cables.
Describes the procedure for opening the RRU cabling cavity cover plate.
Describes the procedure for installing CPRI optical fiber cables.
Details the steps for connecting the RRU power cable.
Describes the procedure for closing the RRU cabling cavity cover plate.
Explains how to attach a specific connector to the RRU power cable.