Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd
3 Installation
To protect an SMU01C, wear electrostatic discharge (ESD) gloves when installing or
replacing the SMU01C.
3.1 Installing an SMU01C
To install an SMU01C, perform the following steps:
Step 1 Hold the handle of the SMU01C, and insert the SMU01C into the correct position in the
power system.
Step 2 Push the SMU01C until its front panel aligns with the front panel of the power subrack.
Step 3 Push the locking latch on the front panel to the right.
Figure 3-1 Installing an SMU01C
----End