1-9
INSTALLATION
DC SERIES COMBI BOILERS DC 23-84, DC 29-106, DC 33-124, DC 33-160
Figure 6: Vertical Concentric Termination - Two Kits
Figure 7: Vertical Concentric Termination - Single Kit
1.4.6 Sidewall Vent Termination
DIRECT VENT - TWO PIPE
Sidewall direct vent applications shall be vented as follows:
• Both the inlet and exhaust terminations should normally be located on the
same plane (side) of the building.
• The exhaust outlet is to be placed so as to reach 24" minimum above the
down-turned intake - to avoid intake re-ingestion of exhaust gases.