EasyManua.ls Logo

IBC VFC 15-150

IBC VFC 15-150
84 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
INSTALLATION AND OPERATION INSTRUCTIONS
1-18
VFC 15-150 - VFC 45-225 MODULATING GAS BOILERS
Figure 19: Condensate trap drainage
Figure 20: Condensate neutralization tank
WARNING
If condensates are to be
discharged into building
drain piping materials that
are subject to corrosion, a
neutralization package must
be used.
CAUTION
When a condensate
neutralization package
is installed, the pH of the
condensate discharge must
be measured on a regular
schedule to ensure the
neutralizing agent is active
and effective.
Figure 18: Condensate trap
disassembly for cleaning

Other manuals for IBC VFC 15-150

Related product manuals