If your installation is not using a grounded-raised floor, and your servers are connected to an 9076 SP
Switch2 clustered environment, all attached server frames in your environment must be independently
grounded to the switch frame. Use the following information to help you install multiple systems to the
9076 SP Switch2 switch frame in a clustered environment:
v Order grounding straps by calling the IBM Quality Hotline at 1-800-IBM-LINE and requesting Part
Number 44P3695, Grounding Kit. Each kit contains one ground strap and the required hardware to
make a single connection between a server and a 9076 SP Switch2, so order one kit for each server
that is connected to the switch.
v An IBM service representative will install the grounding straps by using instructions that are provided
with the grounding kits. Each server frame must be directly connected to a 9076 SP Switch2 frame.
134 Site and Hardware Planning Information

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the IBM RS/60000 Series and is the answer not in the manual?

IBM RS/60000 Series Specifications

General IconGeneral
BrandIBM
ModelRS/60000 Series
CategoryServer
LanguageEnglish

Related product manuals