EasyManua.ls Logo

IBM SAN24B-5 - Chapter 2. Installing and Configuring the Switch; Items Included with the Switch

IBM SAN24B-5
82 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 2. Installing and configuring the switch
You can install the SAN24B-5 switch in the following ways:
v As a stand-alone unit on a flat surface. For instructions and more information,
see “Setting up the switch as a standalone unit” on page 7.
v In an Electronic Industries Association (EIA) cabinet using the fixed rack mount
kit, slide rack mount kit, or the mid-mount rack kit. For more information, see
“Installing in an EIA cabinet” on page 9.
This chapter provides the following information:
v “Items included with the switch”
v “Site preparation and installation requirements” on page 6
v “Setting up the switch as a standalone unit” on page 7
v “Installing in an EIA cabinet” on page 9
v “Configuring the switch” on page 14
Attention: Read the “Safety notices and labels” on page xiii before
attempting any installation, maintenance, or service procedures.
Items included with the switch
The following items are included with the standard shipment of the switch. When
you open the packaging, verify that these items are included in the package and
that no damage occurred during shipping.
Note: If any items are damaged or missing, within the United States and Canada,
contact the IBM Quality Hotline toll-free 1-800-442-6773 or direct dial in
other locations: 770-858-8459.
v The SAN24B-5 switch, containing one integrated power and fan assembly
(optional second power and fan assembly)
v 16 Gbps or 8 Gbps SFP+ modules for the Fibre Channel ports (speed and
quantity as ordered)
v One accessory kit, containing the following items:
SAN24B-5 Installation, Service, and User Guide (this document).
IBM documentation CD
Safety notices
Slim rail rack mount kit
Serial cable with an RJ45 connector
One 6 ft. (1.8 m) country-specific power cord (two if second power supply is
ordered)
Rubber feet, required for setting up the switch as a standalone unit
SAN24B-5 Quick Start Guide
EZSwitch Setup CD
Warranty
Environmental notices
© Copyright IBM Corp. 2012 5

Table of Contents

Related product manuals