8.
Enter the CAT command.
if
required.
to
indicate on which physi-
cal device the disk pack containing the VSAM catelog is mount-
ed.
g. Enter the
DPD
command
to
define the page date set.
DPD
is
mandatory;
all operands are optional.
10.
Press
ENTER.
The system then issues the message
DOS/VS IPL COMPLETE
in which case you can
go
to steps 1
1.
12. and 13.
or
it
issues the
messages
DOS/VS IPL COMPLETE
1100A
WARM
START COpy
OF
SVA
FOUND
Thera
are three possible respo;1ses:
A.
Enter
KEEP.
if
you wish
to
keep the current copy
of
the SVA
(Shared Virtual
Areal; in this case. steps 11. 1
2.
and 13 cannot
be executed.
B.
Press
ENTER.
This
haS
tbe same
effact
as
A. above.
C.
Enter
REJ.
if
you
do
not wish
tc
keep the current copy
of
the
SVA; in this case
yo~
can
go
to
steps 11. 12. and 13.
11.
if
the
SVA
option was
not
specified during system generation.
or
if you wish
to
change the
size
of
the existing SVA. enter the
SET
SVA={nK,nKI
job
control command.
12.
If
you wish
to
create a system directory list (SDLI. specify the
SET
SDL=CREATE
job
control ccmmand. followed by a list
of
the
phase names
to
be included in the
SDL
Ii
you
wish
to
use the IBM supplied SDL. enter the command
EXEC
PROC=SDL.
13.
If
you wish
to
create an SiJA and SDL
for
the VSAM modules
and include your
VSAM modules in this SVA specify:
EXEC
PRO('-:-
IKQVPSVP..
Page
4-85