3. PRIOR CHECKING AND START-UP
3.1. Prior checking
a) Is the machine leveled?
b) Voltage and frequency are the same as those on the nameplate?
c) Are the drains connected and operating?
d) Will the ambient temperature and water temperature remain in the following range?
In case inlet water pressure is higher than 6bar(85psi), install a pressure regulator.
3.2. Start-Up
Once the installation instructions are followed (ventilation, site conditions, temperatures, water
quality, etc.), proceed as follows:
1.- Open the water inlet. Verify the no existence of leakages.
2.- Remove the two locking screws on top of machine, take off the front panel and remove
protection elements on the shield and also on the thickness sensor.
3.- Verify also the thickness sensor moves freely.
4.- Connect the machine to the power supply.
5.- Push the blue switch found on the back of the machine and then set the ice-wash switch to
the position I.
6.- Verify that there are no vibrations or frictions on the elements.