7.- Verify that the water fall to the evaporator is occurring uniformly and all ice cubes are
properly watered.
8.- Replace the front panel in its place.
9.- Verify that after the final cycle, the frost on the aspiration pipe is at 20 mm (0.78 in) of the
compressor.
10.- Verify the ice slab with the pictures below. In case the thickness sensor needs to be
regulated, rotate the thickness adjustment screw CW to increase bridge thickness. Rotate CCW
to decrease bridge thickness.
Damages due to the lack of maintenance and cleaning operations are not included on the
warranty.
4. SEQUENCE OF OPERATION
Initial Start-up: The pump and the drain electrovalve are energized during 30 seconds to empty
the water tray preventing the scale build-up in water. Then the pump and the drain electrovalve
are de-energized, and the water inlet valve is energized filling the water tray until the water level
sensor detects the water reaches the appropriate level. Then the freeze sequence starts.
Freeze sequence: The compressor is energized and the water pump is energized after 30
seconds. The water inlet valve is also energized at the same time that the water pump to
replenish water level and then de-energized. The compressor and water pump will continue
energized until the thickness sensor detects the thickness of the ice slab is the appropriate.
Then the harvest sequence starts.