Do you have a question about the ICP OLR105A12D and is the answer not in the manual?
Guidelines for safe operation and maintenance of the unit.
Precautions to prevent freezing damage during cold weather.
Compliance with national and local codes for oil burning equipment installation.
Specific criteria for furnace placement regarding ambient temperature and clearance.
Overview of different venting methods available for furnaces.
Details on installing furnaces with chimney venting systems.
Instructions for side-wall venting using the DV-2000™ system.
Requirements for combustion air supply and factors affecting it.
Identifying situations requiring outside air for combustion due to contaminants.
Using ducted outdoor air for combustion, especially for DV-2000™ systems.
Procedures for physically installing the burner onto the furnace.
Post-mounting checks and connections for the burner.
Verifying correct electrical polarity for the oil burner's control system.
Guidance on selecting and checking the correct burner nozzle.
Adjusting air and turbulator settings for optimal burner performance.
Ensuring the fuel supply system is ready for operation.
Wiring and installation of electronic air cleaners.
Connecting a humidifier to the furnace system.
Considerations for installing an air conditioning coil with the furnace.
Guidelines for installing ductwork and air filters.
Identification and function of manual switches on the furnace.
Step-by-step description of how the furnace operates.
Operation sequence for Beckett AFII burners with side-wall venting.
Operation sequence for Riello 40-BF burners with side-wall venting.
Operation sequence for Beckett AFG/Riello 40-F with chimney venting.
Operation sequence for the DV-2000™ venting system.
Procedures for testing and adjusting the furnace components.
General guidelines for start-up and annual maintenance checks.
Steps to restart the burner after a shutdown or failure.
Process for curing the ceramic combustion chamber before testing.
Performing smoke and CO2 tests for combustion analysis.
Testing and adjusting supply air temperature rise.
Measuring and checking vent pipe temperature.
Procedure for testing overfire pressure for diagnosing issues.
Information on Fan-Limit control settings and adjustments.
Testing the furnace's high limit control functionality.
Testing the DV-2000™ safety shutdown for blocked vents.
Testing the functionality of the Blocked Vent Shut-Off Device (BVSO).
Overview of preventive maintenance practices for the heating system.
Inspecting and cleaning the furnace heat exchanger for soot accumulation.
Inspecting and potentially replacing the refractory firepot.
Identifying and servicing a flooded firepot.
Information on the self-aligning firepot and its fitment.
Step-by-step guide for removing the firepot for replacement.
Detailed instructions for installing a new firepot.
Procedures for removing and cleaning the burner drawer assembly.
Guidance on replacing the burner nozzle with the specified type.
Replacing the tank and secondary oil filters.
Recommendations for replacing disposable air filters.
Information on motor lubrication, noting they are permanently lubricated.
Checking the CAS-2B kit for proper operation and cleaning.
Annual inspection and cleaning of the BVSO system.
Section for recording start-up test results and furnace information.