EasyManua.ls Logo

IDEAL 61-085 - Proactive Safety Measures; Safety First Procedures

IDEAL 61-085
19 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CAUTION
Toprotectyourself,think“SafetyFirst”:
• Complywithlocalandnationalsafety
codes.
• Useappropriatepersonalprotective
equipment such as face shields,
insulating gloves, insulating boots,
and/or insulating mats.
• Beforeeachuse:
- Perform a continuity test by touching
the test leads together to verify the
functionality of the battery and test
leads.
- Usethe3PointSafetyMethod.(1)
Verify meter operation by measuring
aknownvoltage.(2)Applymeterto
circuitundertest.(3)Returntothe
known live voltage again to ensure
proper operation.
• Alwaysworkwithapartner.
Features:
• VibrationModew/indicatormovement
• AudibleandLEDIndicationofVoltage
- 3 - - 4 -
Symbols on the Unit
RiskofDanger.Important
Information.SeeManual.
Hazardous voltage.
Applicationaroundand
removalfromHazardousLive
conductors is permitted.
AC(AlternatingCurrent)
DC(DirectCurrent)
EarthGround
CAT II
MeasurementCategoryII
applies to test and measuring
circuits connected directly
to utilization points (socket
outletsandsimilarpoints)
ofthelow-voltageMAINS
installation
CAT III
MeasurementCategoryIII
applies to measuring circuits
connected to the distribution
part of the building’s low-
voltageMAINSinstallation
CAT IV
MeasurementCategoryIV
applies to test and measuring
circuits connected at the
source of the building’s low-
voltageMAINSinstallation
~
...

Related product manuals