7
TO LIGHT THE BOILER. (REFER TO BOILER
CONTROLS)
If a programmer is tted refer to separate instructions for the
programmer before continuing.
1. Switch ON electricity to the boiler and check that all
external controls, e.g. programmer and room thermostat,
are ON.
2. Set the Central Heating temperature control (G) to ‘max’.
3. Set ON/OFF switch (H) to ON.
The boiler will commence the ignition sequence supplying
heat, if required.
Note. In normal operation the boiler status display (A) will
display the boiler operation mode.
Boiler frost protection - boiler will re if temperature is less
than 5 degrees C.
During normal operation the burner on indicator (J) will remain
illuminated when the burner is lit.
If the boiler has not lit, after 5 ignition attempts, the following
screen will be displayed.