Innovative DisplayWorks
G-10f/GCG-10f
6
PREPARATION PRIOR TO OPERATION
• Remove all packaging materials before using cooler.
Thisincludes:foampedestal,adhesivetape(usedtoxaccessories)andprotectivegaskets.
• Inspectcoolerforconcealeddamage.Immediatelyleaclaimwiththefreightcarrierifthereisdamage.
IDW is not responsible for damage incurred during shipping.
• For proper operation, place the cooler on a dry, level surface.
• Cleantheinteriorsurfacewithasoftclothandlukewarmwaterbeforeoperation.
• Keep cooler in an upright position for 30 minutes prior to use.
• IDWrequiresthatasoleusecircuitbededicatedfortheunit.Failuretodosovoidswarranty.
WARNING:Donotuseextensioncords.
WARNING:Compressorwarrantiesarevoidifcompressorburnsoutduetolowvoltage.
WARNING:Powersupplycordshouldnotberemovedoralteredinanyway.
Leveling
•Setunitinitsnallocation,makingcertainthereisadequateventilationintheroom.
WARNING:Warrantyisvoidifventilationisinsufcient.
• Proper leveling of the G-10f/GCG-10f cooler is critical to it operating correctly. Condensation removal and
dooroperationwillbeaffectedbyleveling.
< The cooler should be leveled front to back and side to side with a level.
• Ensure that drain hose or hoses are positioned in the pan.
•Removeplugandcordfrominsidethelowerrearofthecooler.
•Theunitshouldbeplacedcloseenoughtotheelectricalsupplysothatextensioncordsareneverused.
Shelving Installation
• Securely insert shelf clips into pilasters
• Shelf clips should be level so shelf lays fl at
• Place shelf on shelf clips
(Maximum load per shelf is 30kg )
Display refrigerators can be loaded within the shelf dimensions from the front to back side.
They can also be loaded in any space from the bottom to the top interior cabinet.
Do not allow product to block the evaporator fan cover because the evaporator fan
helps the cooler to ventilate properly.