EasyManua.ls Logo

INIM Electronics Previdia Compact

INIM Electronics Previdia Compact
32 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6 General information
Fire detection and extinguishant system
1.3 Description of the configuration and programming procedures
Following is a flow chart which summarizes the operations to be carried out during the installation and commissioning
phases of the Previdia Compact system and indications regarding the manuals to refer to for each operation.
1. Installation and cabling (refer to the Installation Manual)
2. Addressing devices
3. Initializing (refer to the Installation Manual)
4. Configuration from the front plate (operations described in this manual)
5. Troubleshooting (operations described in this manual)
6. Connection to PC and reading (optional)
7. Configuration of parameters (editing data, optional)
8. Writing on control panel and testing (optional)
9. Commissioning (operations described in this manual)
10. System handover
11. Maintenance (operations described in this manual)
1.4 Operator classification - Access Levels
The control panel has 4 distinct access levels:
Level 1: Public level - this is the normal access level of the control panel and is the access level for building inhabitants
who are neither authorized to use the system nor instructed in its use.
This level allows building inhabitants to view information on the screen and signalling LEDs, interact with the system (in
accordance with Level 1) and scroll through the information by means of the buttons and touchscreen. Level 1 allows the
following operations only:
mute buzzer
test signalling LEDs
activate alarm signalling when an early-warning process is running
Level 2: Authorized users - this access level is for the system supervisors and is for authorized personnel who are
adequately instructed in the use of the system and its functions.
Access requires the use of a key or entry of a valid access code with sufficient access rights. In addition to the operations
described for level 1 it is also possible to carry out the following operations:
mute alarm signalling devices
rearm the control panel
activate alarm signalling devices manually
disable control panel elements
place in test status one or more of the system elements
Level 3: Programming - this access level is for specialized technical operators who carry out system configuration,
commissioning and maintenance.
Access requires entry of a valid access code with sufficient access rights after inserting a jumper which enables
programming. Refer to the manual for system configuration, commissioning and maintenance.
ONLY authorized technicians, appointed by the Manufacturer can, by means of special tools, carry out repair work on
the motherboard.
Level 4: ONLY authorized technicians, appointed by the Manufacturer can, by means of special tools, carry out repair
work on the motherboard.

Other manuals for INIM Electronics Previdia Compact

Related product manuals