3 Ethernet/IP Communication Protocol
- 14 -
&UIFSOFU*1
.BTUFS
1 1
1 1 1
.%&/
4MBWF
1 1
.%&/
4MBWF
1 1
1 1 1 1 1 1
.%&/
4MBWF
1 1
.%&/
4MBWF
1 1
.%&/
4MBWF
1 1
.%&/
4MBWF
1 1
/FUXPSL
TXJUDI
/FUXPSL
TXJUDI
/FUXPSL
TXJUDI
Figure 3-3 Tree topology
2.2.2 EMC Wiring
■
During on-site installation and commissioning, the signal cables and power cables
must be laid in dierent ducts. Never bundle the signal cables and power cables
together to prevent communication interference.
■
Motor enclosure must be connected to PE of the AC drive. Meanwhile, the
grounding cable on the motor housing side must be connected properly. Failure to
comply will result in poor grounding eect.
■
Shielded cables are recommended. Connect the shield to PE of the AC drive.