Do you have a question about the Instanta CH1000 and is the answer not in the manual?
Refrigeration system requires 12 hours upright settling period before installation to allow oil to settle.
Guidance on proper disposal of electrical and electronic products as WEEE to protect health and environment.
Lists boiler parts and technical details like dimensions, power rating, and pressure.
Instructions for connecting water supply, including filter flushing and pressure limits.
Covers earthing requirements, plug type, and three options for overflow connection.
Steps to prime the cold water system and adjust flow rate.
Covers initial use, heating cycles, ready light, and normal daily operation.
Instructions for cleaning external surfaces, drip tray, and internal components.
Details descaling, filter replacement, tap wear, and available spares.
Explains the intelligent fault diagnosing system and lists service warning codes.
Provides contact details and required information for service enquiries.
Outlines the two-year guarantee, inclusions, and specific exclusions.