I N S T A L L A T I O N M A N U A L X - S T R E A M 2 ™ S L I D E
7
XS2-IM Rev. 10/14 (SBK-XS2 INSTALL)
IMPORTANT: For a Left Turn Slide, Flume A–B is upper flume, and C–D is the lower flume,
in that order. For a Right Turn Slide, C–D is the upper flume and A–B is the lower flume.
Flumes are labeled A–B or C–D in small letters centered on flanges.
A–B Flume C–D Flume
Exit Section Entry Section
Straight Foot
Pedestal (2)
Step Assembly Long Leg Short Leg
Handrail (2)
1–Right; 1–Left
Water Outlet
(comes with entry section)
X-STREAM 2 SLIDE COMPONENTS