SETUP INSTRUCTIONS (continued)
4. Sand shall be filled between the “MAX” and “MIN” marked gauge on the center
pipe. Evenly spread and level out the sand by hand (see drawings 19 & 20).
5. Remove the protective cup from the center pipe top opening.
6. Wash away all sand around the top edge of the tank.
IMPORTANT: Ensure the center pipe (4) remains centered after sand loading
is completed before proceeding to the next step.
6-way valve installation:
1. Place the tank o-ring (5) around the top edge of the tank groove (see
drawing 21). NOTE: Ensure the tank o-ring is free of sand or debris.
2. Lower the 6-way valve over the tank slowly, and ensure the bypass pipe
protruding underneath the 6-way valve fits securely into the center pipe
hub (4) top opening (see drawing 22). Make sure the tank o-ring is securely
fitted between the top edge of the tank groove and the 6-way valve cover
edge.
IMPORTANT: There are three hose connection ports on the 6-way valve,
ensure the outlet connection (from filter to the pool) on the valve is
facing towards the pool, and the inlet connection (from motor to valve) is
aligned with the motor outlet (see drawing 23).
SAVE THESE INSTRUCTIONS
Page 14