EasyManua.ls Logo

iPower SUA7600iED - PARALLEL OPERATION; Parallel Operation Setup

iPower SUA7600iED
42 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 24
2b.Propane/LPG to Gasoline
• Make certain the cylinder knob is fully closed.
1. Align the two inverters on a firm, flat and level
surface at a minimum 20 inch apart.
Parallel Operation (2 x SUA7600iED Models)
Set up and Operation
NOTE:
Only connect two identical (same model) generators
together for parallel operation.
Paralleling this generator to a generator that is not
compatible can cause a low voltage output that can
damage tools and appliances powered by the
generator. Do not connect or disconnect parallel
cables while the generator is running to avoid damage.
Parallel operation gives you the ability to link this
generator to a compatible AIPOWER generator for
combined running and starting power output. Use
only the AIPOWER approved cables for parallel
operation. For single generator operation, the parallel
operation cable must be removed.
NOTICE
Fire and electrocution hazard. Never connect or
disconnect the parallel cord leads when a generator
is running. Do not parallel more than two generators.
Use only AIPOWER generators for paralleling.
WARNING
WARNING
If not spaced apart, the exhaust heat
from one generator discolors or melt
the plastic shell on other generator.
2. Both generators to be turned off and all electrical
loads disconnected before paralleling operation.
3. Make sure the LOW IDLE switch is in OFF
position on both generators.
20”
12V
带防水
12V
带防水

Other manuals for iPower SUA7600iED

Related product manuals