DOC. SIE10110 Rev. 6 Page 32 of33
- Two cables for the connections of T2000 to the local earth system, both for generation and
measurement, 10 m long, 2.5 sq. mm cross section. Terminated on both sides with a safety banana
connector.
- Two auxiliary earth spikes, screw shaped, for the dispersion of the current into the soil. Length:
0.95 m; screwed section 0.6 m. Material: zinc-plated iron. Complete with socket for the connection
to the generator.
- Handle to screw the spike into the ground.
- One current clamp to connect T2000 to the local earth system.
B) Voltage measurement
- One cable for the connection of T2000 to one voltage spike, 50 m long, 2,5 sq. mm cross section,
wound on a wheel. Terminated with a safety banana connector for the connection to the voltage
spike, and with a safety socket for the connection to T2000.
- Two auxiliary earth spikes, to measure the voltage drop; material: zinc-plated iron; length: 0.5 m.
Complete with connector for the measurement cable.
- One measurement clamp to connect T2000 to the local earth system.