Inspection and Installation 
  Copyright ©  Itech Electronic Co., Ltd.  1 
Chapter1 Inspection and Installation 
1.1 Verifying the Shipment 
Unpack  the  box  and  check the  contents  before  operating  the  instrument. If 
wrong items have been delivered, if items are missing, or if there is a defect 
with the appearance of the items, contact the dealer from which you purchased 
the instrument immediately. The package contents include: 
Checklist of Package Contents 
The IT6800A/B series include:   
IT6831A/IT6832A/IT6833A/IT683
5A/IT6861A/IT6862A/IT6863A/IT6
872A/IT6873A/IT6874A/IT6832B/I
T6833B/IT6835B/IT6861B/IT6862
B/IT6863B/IT6872B/IT6873B/IT68
74B 
IT-E171/IT-E172
/IT-E173/IT-E17
4 
User may select an appropriate 
power cord that matches the 
specifications of power socket 
used in the area. See the 
Section Connecting the Power 
Cord for details. 
It contains IT6800A/B power 
supply User’s Manual, 
Programming Guide and other 
user documentations. 
It is the test report of the 
instrument before delivery. 
 
NOTE 
Upon verification of the shipment, keep the package and relevant contents thereof in a 
safe place. When returning the instrument for warranty service or repair, the specified 
packing requirements shall be met. 
1.2 Instrument Size Introduction 
The instrument should be installed at well-ventilated and rational-sized space. 
Please select appropriate space for installation based on the power supply size. 
IT6800A/B series power supply different models are the same size, the detail size 
of the power supply are shown as below. (Take the example of IT6862A)