About this Document
7
1.2.2 Signs and symbols
1.3 Revision and validity
1.4 Supporting documents
You can obtain information about the applicable documents from your local sales partner or
in the download area of Ivoclar Vivadent at: http://www.ivoclarvivadent.com.
Symbol Significance
Additional information, e.g. for better understanding, for simplifying
workflows or for further information
Prerequisite which must be followed before the subsequent actions can be
performed
Individual steps which you must perform
1., 2. Several steps that you must perform in the given order
The result indication of an operation step or several steps, for success control
Version Date
Amendments to the
previous version
1.0 30-11-2017 Initial creation date
Document Clarification
Checklist for your PrograMill system Information about requirements that must be
observed for transport, installation and use of
the PrograMill system
Operating Instructions PrograMill PM3 Instructions on operating the milling machine
PrograMill PM3 and the PrograMill Tank
Operating Instructions PrograMill PM5 Instructions on operating the milling machine
PrograMill PM5 and the PrograMill Tank
Operating Instructions PrograMill PM7 Instructions on operating the milling machine
PrograMill PM7 and the PrograMill Tank
Operating Instructions PrograMill
Suction Unit
Important information about the use of the
PrograMill Suction Unit (optional)
Safety Data Sheet PrograMill Fluid Important information about the use of the
PrograMill Fluid coolant concentrate