EasyManua.ls Logo

J. D. NEUHAUS PROFI 6 Ti - User Manual

J. D. NEUHAUS PROFI 6 Ti
59 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
JDN OPERATION MANUAL
AIR HOISTS
,, ,
16
10
6
3

Table of Contents

Other manuals for J. D. NEUHAUS PROFI 6 Ti

Question and Answer IconNeed help?

Do you have a question about the J. D. NEUHAUS PROFI 6 Ti and is the answer not in the manual?

Summary

SAFETY INSTRUCTIONS

PERSONNEL SAFETY

Requirements for trained personnel operating, maintaining, and inspecting JDN Air Hoists.

PRODUCT INFORMATION

ASSEMBLY OVERVIEW

EXPLOSION PROTECTION

Information on JDN Hoists in explosion-hazardous areas based on ATEX guidelines.

DECISION CRITERIA FOR EXPLOSION HAZARDOUS AREAS

INTENDED USE

OPERATING CONDITIONS

Details suitable operating environments, temperatures, and air supply requirements.

ENERGY REQUIREMENTS

AIR PRESSURE CONDITIONS IN OPERATION

Explanation of how system pressure affects hoist operation and load lifting.

TRANSPORT AND STORAGE

INITIAL OPERATION

HOIST INSTALLATION

Critical safety warnings and requirements for installing the hoist.

CONNECTING THE CONTROLS

REPLACING CONTROLS

CONNECTING TO THE MAIN AIR SUPPLY

CHECKING PRIOR TO INITIAL OPERATION

OPERATION

RULES FOR SAFE OPERATION OF HOISTS

Operator responsibilities for safety and adherence to procedures.

General Safety Precautions

Essential safety points to be observed when using JDN Air Hoists.

CONTROLS

EMERGENCY STOP DEVICE

OVERLOAD PROTECTION

Description of the hoist's direct-acting overload protection safety clutch.

ATTACHING THE LOAD

Dangers and precautions when attaching loads to the hoist hook.

LOWERING THE LOAD

TAKING OUT OF OPERATION

DISMANTLING

Warning and procedure for dismantling the hoist by qualified personnel.

MAINTENANCE

MAINTENANCE AND INSPECTION INTERVALS

Importance of intervals and reducing them in wear-promoting conditions.

INSPECTION AND REPAIRS

Details on classification, theoretical operating time, and general overhaul.

CHECKING BRAKING FUNCTION

CHECKING LIFTING AND LOWERING LIMITERS

Procedure for testing lifting and lowering limiters and buffers.

CHECKING EMERGENCY STOP FUNCTION

Procedure for testing the emergency stop button function.

LUBRICATING THE CHAIN

SERVICE UNIT

FILLING AND ADJUSTING OILER

REPLACING BRAKE DISC, BRAKE PISTON AND VANES; MOTOR INSTALLATION; MOTOR LUBRICATION

REMOVING AND INSTALLING LOAD SLEEVE, BOTTOM BLOCK, CLAMP AND BUFFER

REMOVING AND INSTALLING CLAMP AND BUFFER

CHECKING CHAIN, CHAIN SPROCKET AND CHAIN GUIDES

Criteria for replacing the hoist chain and checking sprockets/guides.

CHECK DIMENSIONS

REMOVING AND INSTALLING CHAIN

REPLACING CHAIN AND CHAIN SPROCKET

OVERLOAD PROTECTION

ADJUSTING OVERLOAD PROTECTION

Method for adjusting overload protection based on test loads.

CORRECTING THE LIMIT VALUE SET

Procedure for correcting the limit value setting of the overload protection.

RESETTING THE LIMIT VALUE

Procedure for resetting the limit value of the overload protection.

FAULTS, CAUSE AND REMEDY

ACCESSORIES

APPENDIX

TECHNICAL DATA

Table of technical specifications for different JDN Air Hoist models.

DIMENSIONS

J. D. NEUHAUS PROFI 6 Ti Specifications

General IconGeneral
TypePROFI 6 Ti
CategoryChain Hoists
OperationPneumatic
Air Pressure6 bar
Temperature Range-20°C to +70°C
Lift Height3 m
Chain LengthAvailable upon request
Load Capacity6 t

Related product manuals