EasyManua.ls Logo

JF 40P - Step-by-Step Operation

JF 40P
60 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
16
a) Turn the chute (1) to the desired direction, according instructions on previous page.
b) Adjust the deflector position (2) according instructions on previous page.
c) Turn the machine on.
d) Put the product on feeding nozzle (3) on continuously way as possible and in quantity
compatible with the machine and feeding nozzle capacity.
NOTE: The new bundle must be placed over the previous one, so the machine has been more
uniform amount of product coming in. That it will always do a uniform and on selected size cut.
e) The forage jet will be thrown by the output chute (1).
5- Step by step operation
1
2
3

Table of Contents

Related product manuals