EasyManua.ls Logo

John Bean B400 - 6.3 Storage; 6.4 Changing the mains fuse

John Bean B400
126 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
88
6-7
1
2
Maintenance
6.3 Storage
When the unit will be stored for a several weeks or
longer, prepare the unit correctly:
• Shut down the unit properly, 5.2.4.
• Remove the threaded shaft from the balancer.
• Apply a thin layer of non-corrosive oil on all threads
and cones.
• Wrap oiled items in paper to keep the parts dust-
free.
Before putting the unit into use again, clean all oiled
parts.
6.4 
Refer to Figure 6-7.
• Switch off the unit.
• Unplug the power cable from the power outlet.
• Remove the power cable from the machine mains
socket (1, Fig. 6-7).
• Pull out the fuse holder (2, Fig. 6-7).
• Replace the damaged fuse with another fuse having
an identical rating.
• Return the unit to its original functioning state, by
following the steps above in reverse.

Related product manuals