EasyManua.ls Logo

Johnson Controls IQ4 HUB - Page 129

Johnson Controls IQ4 HUB
198 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SYSTEM TESTS
PowerG Signal Strength
This version of the PowerG test allows the Panel to show the actual dBm signal
strength from a PowerG sensor vs the traditional Strong, Good, Poor
measurement. It also tracks the signal strength over time and graphs it against
the ambient noise floor.
QOLSYS CONFIDENTIAL AND PROPRIETARY
PAGE OF 129 198
POWER G SIGNAL STRENGTH
FIND IT
POWERG TEST
SYSTEM TESTS
Swipe down
for access
SETTINGS
ADVANCED SETTINGS
ENTER CODE (1111, 2222)
Strong, Good, Poor or No Signal
*PowerG daughter card
must be installed in the
panel to access this test.
Note: for UL/cUL and EN Grade 2 installations the
signal strength shall be “Strong