EasyManua.ls Logo

Johnson AE Series - Maintenance

Johnson AE Series
44 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
901-10113 - 27 - 9/16/2024
5 Maintenance
It is important that every refrigerated truck body owner and/or operator have an organized
preventative maintenance program. Preventative maintenance will help to keep your Johnson
Refrigeration System in top operating condition. The maintenance schedule below is suggested to
ensure that all items receive the proper frequency of attention. Use the Section Reference to locate
instructions for the maintenance task.
Table 5: Maintenance Schedule
Mai ntenance Ta sk
Section
Reference
Dail y
1-Month
3-Month
Check Cold Plate frost accumulation
If more than ½”, Defrost is needed
3.7
X
Truck Body Inspection
Truck Body
General Manual
X
Check Line Cord
5.1
X
Check Condenser Coil
5.2
X
Cold Plate Inspection
5.3
X
Condensing Unit Inspection
5.4
X
Clean and Wax Fiberglass
5.5
At least annually