EasyManua.ls Logo

JUKI DSC-246 - Installation Process; List of Parts to be Replaced

JUKI DSC-246
32 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
vi
BEFORE OPERATION
Before you put the machine into operation for the rst time after the set-up, clean it thoroughly .
Remove all dust gathering during transportation and oil it well.
• Con rm that voltage has been correctly set.
Con rm that the power plug has been properly connected to the power supply.
Never use the machine in the state where the voltage type is different from the designated one.
The direction of normal rotation of the machine is counterclockwise as observed from the pulley side.
Take care not to allow the machine to rotate in the reverse direction.
Never operate the machine unless the machine head and the oil tank have been lled with oil.
For a test run, remove the bobbin and the needle thread.
For the rst month, decrease the sewing speed and run the sewing machine at a speed of 2,000 sti/min or less.
When carrying the machine, do not hold it by the synchronizer located at the rear of the handwheel.
Operate the handwheel after the machine has totally stopped.
Observe the standard thread trimming speed, 185 sti/min.
CAUTION :
Check the following so as to prevent maloperation of and damage to the machine.
15 –
21142302
(Caution) The parts attached with an asterisk ( * ) are the exclusive parts for the DSC-246-7.

Table of Contents

Related product manuals