Fuse replacement 1-9
Sequence 1-8
Primary address 7-4
Program message terminator (PMT) 7-13
Programming 6-16
and reading registers 8-5
enable registers 8-5
Programming examples 2-21
Program and read measurement event
reg
ister 8-19
Pulse current digitization 3-31, 3-32
Pulse current measurements 3-30
Read error queue 8-21
Read status byte 8-9
Programming syntax 7-9
Pulse Current Measurements 3-1, 3-2
Configuration 3-6
digitization 3-22
Integration times 3-4
Menu items 1-15
Mode 1-10
Programming examples 3-29
Pulse sequences 3-26, 3-27
readings 7-5
step method 3-23
TLEV Steps 3-23
Trigger level settings 3-25
Pulse timeout 1-15, 1-16, 3-7, 3-15, 3-17,
4-4, 4-8, 12-14
Q
Query commands 1-18, 7-10
Questionable event status
8-16
Queues 8-2, 8-19
R
READ
ARRay? 3-15
READ? 3-15, 4-14, 7-4, 7-5, 10-4
Reading back V and I 2-15
Reading registers 8-5
Re-assembly 15-6
RECALL SETUP 1-15
Register bit descriptions 8-10
Relay
connector (9-pin D-sub) 5-4
control 5-1, 6-1
Pinouts 5-4
Remote 1-7
enable 7-6
indicator and LOCAL key 7-8
Sense 2-3
remote display 1-7
Remote display option 1-7
Removal
Analog board 15-4
Case cover 15-4
Digital board 15-5
Mechanical components 15-5
REN (remote enable) 7-6
Resistor considerations 13-4
Response message terminator (RMT) 7-14
REVISION NUMBER 1-15
RFI 2-4
S
Safety symbols and terms 1-2
SAVE SETUP 1-15
SCPI command
display
11-2
Error queue 8-21
General notes 12-2
Output relay control 5-6
Outputting voltage and current 2-12
Subsystems reference tables 12-2
SCPI programming 1-18, 3-13, 4-13
DVM 2-19
Measure V and I, and DVM input 2-17
Outputting voltage and current 2-12
SDC (selective device clear) 7-7
Selective device clear 7-7
Sending a response message 7-14
SENSe command summary 12-6
SERIAL NUMBER 1-15
Serial polling 7-7, 8-8
Serial polling and SRQ 8-8
Service request enable register 8-8
Setting the GPIB timeout for Responses 7-4
Setups — Save, Power-on, and Recall 1-14
Short-form rules 7-11
Signal oriented measur
ement command
summary 10-2
Signal Oriented Measurement commands 10-2
Simplified power supply diagram 1-6
Simulated GSM phone current profile E-4
Simulating battery impedance E-2
Single command messages 7-12
Sink operation 2-19
Solder repairs 15-2
SOURce command summary 12-16
SPE, SPD (serial polling) 7-7, 8-8
Specifications 1-2,
F-2
Test Equipment Depot - 800.517.8431 - 99 Washington Street Melrose, MA 02176
TestEquipmentDepot.com