Section 1
Unpacking
Unpacking
We recommend that a crane and forklift truck be
available for unloading and assembly
• Before opening shipping container inspect exterior for
any damage. Remove seal and open container doors.
CAUTION
Take care when opening doors as load may have shifted
or restraints may have broken.
• Remove boxes from doorway of container one at a time
using a forklift truck. Each box weighs
approximately 2600 lbs 91200kg)
• Check strapping on each bundle before attempting
to remove
• Attach chains to the packing frame using shackles and
using suitable equipment (eg. fork-lift or tractor)
drag framework bundles out of container. To move
bundles away from front of container lift from side with
forklift. Do not lift under angle iron frame, lift only under
centre frame. Each bundle weighs approximately 7000 lb
(3200 kg).
Connect chains to these points
!
!