EasyManua.ls Logo

Kemppi MasterTig MLS 3003 ACDC - Page 27

Kemppi MasterTig MLS 3003 ACDC
32 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
27
TESTING OF THE PRE-INVERTER (PFC)
1. Disconnect cooling fans (A001/X9).
2. Disconnect (HF, Spark generator card) A003/X8.
3. Connect jumpers A001/X14 (overvoltage) and A001/X16 (main switch open) on control card
A001.
4. Connect jumpers X17/(1-4) and X17/(3-6) on Z004.
5. Disconnect Z004/X6. In the newer model where X4 contains two cables, remove theX6 cable
going to A002/X1.
6. Connect Kemppi Multipower with 22 VAC with current limit 2,5 A between phases L2, L3
7. Connect Kemppi MLS- Service power DC+ = 560Vdc to wire connector X6 and DC- to Z004/X8
(X6=560V, X8=0V). Again in newer model, connect DC+ to X6 cable going to A002/X1.
8. Switch on Multipower and MLS-Service power. Turn the machine on.
9. Put machine to TIG mode. Measure DC -link voltage from Z004/X8 and X4 pads.
10. DC -link voltage should raise to 720-740 VDC. You can discharge the DC-link with changing to
MMA mode and back to TIG.
11. If voltage raises and stops to 720Vdc the pre-inverter is OK.
12. Restore jumpers and wires .
X17/1-4
X17/3-6
Measurements
X8
X4

Other manuals for Kemppi MasterTig MLS 3003 ACDC

Related product manuals