EasyManua.ls Logo

Kessel Aqualift F Basic - Page 67

Kessel Aqualift F Basic
144 pages
Go to English
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Establish cable pass-through
Conduit pipe connection (variant A)
NOTE
The conduit pipe is to be installed with max. 45° bend.
Select drill with appropriate hole saw (Art. no. 500101).
Carry out drilling for the conduit pipe in accordance with
the hole saw instructions.
Insert conduit pipe seal.
Grease conduit pipe and slide through the conduit pipe
seal.
Cables/plugs can be fed through the conduit pipe.
... or
1
3
2
A
Cable fastener (variant B)
Drill hole for cable fastener (M16).
Insert cable fastener into the chamber, screw into place
and bond with PVC adhesive.
Feed cable through the cable fastener and clamp in
place.
3
2
1
B
EN
016-102_01 DE_EN_FR Pumping station / Installation and operating manual 67 / 144

Other manuals for Kessel Aqualift F Basic

Related product manuals