5. Commissioning
Check whether the steps explained in the installation chapter have been
properly followed.
Clear any building waste from the tank if necessary.
Establish the power supply for the system. If applicable, lift the float switch
to check whether the submersible pump starts up automatically.
✓ With connecting the connection cable(s) to the power supply, the system is
ready for operation.
✓ If a control unit is fitted, its initialisation starts automatically (separate
instructions).