EasyManua.ls Logo

Keysight Technologies N9000B - Page 13

Keysight Technologies N9000B
20 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation Note N9000-90039 13
Option T03 and T06, Tracking Generator Upgrade Kit
2. Refer to Figure 6. Pull the front frame carefully away from the chassis. Remove the ribbon
cable W1 from the A8 Motherboard.
Figure 6 Front Panel Cable
3. Pull the Front Frame Assembly carefully away from the chassis.
W1 may have locking springs on each side. Depress the spring on each
side of the connector to remove from the motherboard.

Other manuals for Keysight Technologies N9000B

Related product manuals