EasyManua.ls Logo

Keysight E4990A - Quick Start; Front Panel: Names and Functions of Parts

Keysight E4990A
31 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Keysight E4990A Impedance Analyzer 15
Introduction
Environmental Requirements
Figure 1-3 E4990A with Option 1CN handle
The handle kit (Option 1CN) is used for transporting and relocating of the
E4990A.
The rack- mount kit (Option 1CM) includes two flanges (locking side plates) for
mounting the E4990A on a rack (482.6 mm/19 inches) conforming to the EIA
Standard.
Option 1CP comes with both, the handle kit and rack- mount kit.
While referring to Figure 1-2 install the handle kit/rack- mount kit by following
these steps.
Step 1. Remove the adhesive- backed trim strip (1) from each side of the outer frame
of the E4990A front panel.
Step 2. Use the provided screws to mount the
front handles (2) - for Option 1CN
rack- mounting flange (4) - for Option 1CM
both - for Option 1CP
on each side of the E4990A front panel frame.
Step 3. (Option 1CN/Option 1CP). Attach the modified trim strip (3) provided to each
front handle in order to cover the front panel locking screws.
Option 1CN contains 2 pieces of standard and 1 special handles -
E4990-20001. Only one of the standard handle is required to be used to
mount on the analyzer. Standard handle is used for the left side and
special handle is used for the right side. Refer to Figure 1-3.

Other manuals for Keysight E4990A

Related product manuals