20 Keysight E5063A Network Analyzer
Installation
Installing Front Handles/Rack Mounting Flanges
1-
• front handles (2) - for Option 1CN
• rack-mounting flange (4)- for Option 1CM
• both- for Option 1CP
on each side of the E5063A front panel frame.
Step 3. (Option 1CN/Option 1CP). Attach the modified trim strip (3) provided to each
front handle in order to cover the front panel locking screws.
Step 3. (Option 1CM/Option 1CP). Remove the four bottom feet of the E5063A (lift
the bar marked TAB on the inner side of the foot and slide the foot towards
the bar).
Step 4. (Option 1CM/Option 1CP). Mount the E5063A on the rack.
If the installed front handle becomes damaged, replace it with a new one
immediately. A damaged handle can break while moving or lifting the
instrument and cause personal injury or damage to the instrument.
Use both a front handle and a rack-mounting flange in the same time
certainly. Do not attempt to install flanges or handles separately with
hardware provided. Serious electrical damage will occur to the instrument.