DocumentNo.:KE-0015-00 Sheet:20/37
IIIStrainerInstallation
6.8Gradually raise the line temperature and pressure for pilot operation. Retighten all
threadedparts,ifneeded.
6.9 Incaseflangesarewelded topipes,DONOT installstrainers tothepipesuntil the
weldedflangescooldown.
6.10 Incasepaintedstrainersaresuspendedbyaslingbelt,protectthepaintedsurface
ofthestrainerbodywithcloth.
6.11 Forpaintedproducts,useawasherunderthepipenuttoprotectthepaintedsurfaceof
the end flange. Prepare appropriate bolts, nuts, washers and gaskets beforehand for
subsequentinstallation.