Figure 7
Indoor Unit Installation
1. Fix the air pipe connection foam (Fig. 8).
Tear off the air pipe connection foam
adhesive rstly, which is used for
maximum 65mm roof thickness.
Clip it to an appropriate size if your
roof thickness is less than 65mm.
Figure 8
Stick the foam at the air inlet, which is
xed into a circle.
Figure 9
Firm the foam with a cable tie at the
air inlet.
Figure 10
air inlet
cable tie