EasyManua.ls Logo

Klarstein GL90WS - Operation

Klarstein GL90WS
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
31
EN
OPERATION
Before operating the device for the rst time after correct installation, please
connect the hood to the mains (please observe the generally applicable safety
regulations).
Control panel 1
1 The motor is OFF.
2 The motor is running at the lowest level.
3 The motor is running at the medium level.
4 The motor is running at the highest level
5 On/o switch for the integrated light.
Control panel 2
1 Timer button
2 Light button
3 LED display
4 Speed selection button
5 On/O button

Related product manuals