EasyManua.ls Logo

KLEMM KR 702-2 User Manual

Default Icon
100 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
TECHNICAL MANUAL
Description
Maintenance
Operation
for
Hydraulic crawler drill rig
KR 702-2
KLEMM Bohrtechnik GmbH
Wintersohler Str. 5
D-57489 Drolshagen
Tel: +49 (0) 2761 705-0
Fax: +49 (0) 2761 705-50

Table of Contents

Questions and Answers:

KLEMM KR 702-2 Specifications

General IconGeneral
BrandKLEMM
ModelKR 702-2
CategoryConstruction Equipment
LanguageEnglish

Summary

Safety Instructions

General References to Accident Avoidance and Wear Prevention

General guidance on preventing accidents, damage, and wear during operation and maintenance.

General Safety Instructions

Essential safety directives covering machine use, personnel requirements, and personal protective equipment.

Safety Instructions for Drill Rig Operation

Specific safety guidelines for operating the drill rig, including danger zones and safety distances.

Safety Instructions for Drill Rig Maintenance

Critical safety protocols for performing maintenance, including service intervals and part replacement.

Preface

Technical Description

Base Frame with Crawler Tracks and Boom

Overview of the drill rig's foundational structure, including crawler tracks and the boom assembly.

Crawler Undercarriage

Detailed description of the drill rig's crawler system, including drive, tensioning, and transmission components.

Boom Assembly

Description of the boom's components, such as the swivel head and mast carrier, and their functions.

Drill Mast 164 and Attachments

Technical details of the drill mast, its structure, and associated attachments like the drill unit.

Engine and Central Hydraulics (Power Pack PP-95-DS)

Technical specifications and overview of the power pack's diesel engine and hydraulic system.

Operation

Operating Instructions

General guidance on operating the drill rig, including control panel layout and connection procedures.

Control Elements on Power Pack PP-95-DS

Identification and function of control elements located on the Power Pack unit.

Prior to Start-up

Essential pre-operation checks and procedures to ensure safe and correct startup.

Engine Start-up

Step-by-step instructions for starting the diesel engine and its warm-up procedures.

Tramming the Crawler Drill Rig

Procedures and safety recommendations for moving the drill rig on its tracks.

Setting Up and Alignment

Guidelines for positioning and aligning the drill rig and its mast for drilling operations.

Drilling Controls

Explanation of controls used for drilling operations, including pressure adjustments.

ESS Control Box on Slewable Control Panel

Description of the ESS control box functions, including emergency stop and gear selection.

Telescopic Function of the Drill Mast

Instructions on operating the drill mast's telescopic function using the hand-operated valve.

Operation

General operational guidelines, including mast alignment and drilling parameters.

Crawler Tracks

Adjusting Track Tension

Procedure for checking and adjusting the tension of the crawler tracks for optimal performance.

Repairs on Crawler Chains

Safety precautions and procedures for repairing or replacing crawler chains.

Controls on Tramming Gear Box

Information on checking oil levels and controls related to the tramming gear box.

Care and Maintenance of the KLEMM Crawler Drill Rig Type KR 702-2

Maintenance Intervals

Schedule of recommended maintenance tasks based on operating hours and time intervals.

Recommended Oil- and Grease-Types for Drill Rig KR 702-2 with Power Pack PP-95-DS

Specifies the correct types and quantities of oils and greases for various components.

Filters and Filter Inserts for KR 702-2 and PP-95-DS

Details on identifying, replacing, and maintaining filter elements for the rig and power pack.

Filter and Filter Inserts for KR 702-2

Specific filter types and replacement procedures for the KR 702-2 drill mast.

Filter and Filter Inserts for Power Pack PP-95-DS

Details regarding filter replacement for the hydraulic system of the Power Pack.

Scope of the 100 Hour Inspection

Outlines the specific tasks to be performed during the 100-hour periodic inspection.

Lubrication Chart Maintenance and Service Intervals

Comprehensive chart detailing lubrication points and service intervals for all major components.

Special Instructions for Deutz Diesel Engine TCD 2012 L04 2V

Specific maintenance guidelines and precautions for the Deutz diesel engine.

Hydraulics

Information on hydraulic oil, filtration, oil changes, and general hydraulic system maintenance.

Attachment Points for Truck Transport

Attachment Points for Drill Rig KR 702-2

Identification of secure points on the drill rig for fastening during truck transport.

Rope Attachment Points (1-4) on the Drill Rig Type KR 702-2 for Loading with the Help of a Crane

Technical Data

Technical Data KR 702-2

Detailed specifications for the KR 702-2 drill rig, including dimensions, weight, and performance data.

Technical Data Power Pack PP-95-DS

Specifications for the Power Pack, covering engine, hydraulic system, electrics, and dimensions.

Technical Data of Sound Level Measurement acc. to DIN EN 791 and 2000/14/EC (Outdoor-Noise-Directive)

Measurement data for sound power and sound pressure levels in various operating modes.

Kinematic Possible Mast Movements KR 702-2 Basic Version