EasyManua.ls Logo

Kohler REGATTA drop in 11303A-GAB-0 - Product Notices; Product Requirements; Plumbing Specifications; Installation Requirements

Kohler REGATTA drop in 11303A-GAB-0
15 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6
1128227-A01-D Date: 13/8/2010
PRODUCT REQUIREMENTS
A. Summary Of Key Requirements
Observe all local plumbing codes.
Provide properly-dimensioned framing.
Baths with airjets are designed for a variety of
installations, depending upon the model chosen.
between the valves and spout may be required.
that may inadvertently be used as a means of support
are not appropriate or safe for this installation.
D. Product Inspection
Carefully unpack and inspect the bath with airjets
for damage. Leave all materials in the carton during
construction to prevent damage.
C. Electrical Requirements
The installation must have a Class A Ground-Fault
Circuit-Interrupter (GFCI). The GFCI protects against
Line-to-ground shock hazard. Use a 220-240 V, 10A
(minimum), 50 Hz dedicated service for the bath with
airjets.
PRODUCT NOTICES
WARNING: Risk of electrical shock. A licensed
electrician should make all electrical connections.
WARNING: Risk of electrical shock. Connect
only to a circuit protected by a Ground-Fault
Circuit-Interrupter (GFCI) or Earth-Leakage
Circuit-Breaker (ELCB).
WARNING: Risk of electrical shock. Disconnect

WARNING: Risk of injury or property damage.
Please read all instructions thoroughly before
beginning installation, including the following
Product Requirements.
WARNING: Keep the area around the blower
motor clean and free of debris.Ensure that the
area around the blower motor is free of sawdust,
insulation, dirt, or other small loose debris. Such
material could clog the blower motor air ducts and
cause unsafe operation or affect performance
of the bath with airjets. Do not relocate the
system in the absence of kit instructions, as this
could adversely affect the performance and safe
operation of the bath with airjets. Kohler NZ shall
not be liable under its warranty or otherwise for
personal injury or damage caused by any such
A. Installation Hazard Notification
B. Plumbing Specifications
INSTALLATION REQUIREMENTS
A. Tools Required
Adjustable pipe wrench
• Rule
Level
Safety shoes
Safety glasses
Square
Screwdriver
Pliers
Utility knife
Pencil
• Measuring Tape
B. Materials Required
Plumber’s putty
Wall coverings, as
necessary
Silicone sealant
Gypsum cement
(optional)
Construction adhesive
(optional)
Protective covering for
bathtub
Nails
Silicone Sealant
Plus:
Conventional woodworking tools and materials or
conventional bricklaying tools and materials
Drop Cloth
Construction adhesive (optional)
Cement or mortar (optional)
2x4s or 2x6s
PVC Cement

Related product manuals